In asset management the most effective way is to deploy methods that give centralized control over costs, optimize asset utilization and development of the network, and provide a clear picture of its reserves.

Only by use the results of cyclical medium- and long-term plans can be ensured that the resources spent on the network are not lavishly scattered, but thoughtfully spent taking into account also the network reserves and the potential cooperation between different areas.

For the high voltage networks it is an obligation of the Licensees. Under the Electricity Act MAVIR must prepare a system network development plan in every two years by taking into account the network Licensees’ plans. For this the network Licensees must also prepare these plans. The primary purpose of this legislature is that the costs of unnecessary investments are not charged to the consumers

The legislature is only about the high-voltage networks, but it is easy to see that the optimal allocation of spent resources on medium and low voltage networks is equally important, not only because of the cost of the extra investment for consumers, but also for the network Licensees

The larger the number of network elements, without long-term network development plans, the more difficult to achieve this goal. Due to the large mass of the low-voltage network elements, this is not possible at all without such plans. But this is already recognized in the end of the 1970s at Budapest Utility, where a systematic planning methodology was introduced, named aptly basic planning, which was used for a long time there, and which is still used by us - obviously with substantial updates - to optimize the development of networks.

It is obvious that in order to determine the individual steps leading to the optimal development strategy, the only effective method is to simulate a load and network model to determine the reserves of the network, and also to simulate and to think about the possible consequences of the planned development steps. 

Without the use of systematic long-term plans many wasteful investments are realized at Licensees. Indeed, when a problem to be solved, for example when a new consumer demands must be met, then without simulation of the reserves of the network we know only in very simple cases, how much extra load the network can carry. Therefore, a new transformer station or a new line is built also in cases when this would not be necessary at all. And this is just the tip of the iceberg, which is immediately catch the eye of an expert. See Case Studies 

Because of the large mass of low-voltage networks this problem cannot be treated effectively without systematic use of appropriate documentation system. For such a massive demand you need a documentation system that enables lightning-quick overview of the results and presenting them for decision makers. 

Also due to the large mass of low-voltage networks it is not easy, either, to keep the long-term plans (basic plans) fresh and to ensure that the development of the network should be only realized according to the basic plans. In particular, the latter is a serious challenge for the strategic management of Licensees, but only by ensuring this the goal can be achieved that the allocation of resources spent on the network is as efficiently as possible, not lavishly done.

For this to be achieved the planned investments and the plans to be updated should be ranked based on criteria developed by us together with the Licensee. These all together form the Smart Investment Planning method. 

This ranking is based on:

- the size of the problem to be solved
- the costs of solving of the problem 
- the number of consumers involved 
- the number of disturbancies caused by the problem 
- the side-effects of the solution proposed

Our collegues have twenty year experience in long term planning of low and medium voltage networks, they know and use the most state of the art planning methods that are indispensable in case of tasks with these level of difficulty.

Having our highly computerized method especially developed for examination of the co-operation possibilities of the independently operating network parts we optimize the supply of electricity demands, the operation of the existing networks and the network development decisions with
- problem exploring studies and
- strategic (long term) plans of low voltage networks and with
- strategic (long term) plans of medium voltage networks
making also possible an overviewable control of the network investments.

Free capacity of the network
Free capacity of the network